Film Production Budget Calculator

Create film production budgets with above-the-line, below-the-line, and post-production cost breakdowns.

Cómo Usar Esta Calculadora

1

Select production type and scale

2

Enter above-the-line costs

3

Add production and post costs

4

Get complete budget breakdown

Preguntas Frecuentes

What's above vs below the line?

Above-the-line: creative principals (writer, director, producers, cast). Below-the-line: crew, equipment, locations, post. ATL is negotiated flat fees; BTL is often hourly or weekly.

What percentage is post-production?

Typically 15-25% of total budget for narrative films. Documentaries with heavy editing may be 30-40%. VFX-heavy projects can be 50%+ of budget.

How much contingency should I budget?

Standard is 10% contingency. Complex productions, first-time directors, or difficult locations warrant 15-20%. Studios often require contingency before greenlighting.

What drives production cost per day?

Crew size, equipment package, location fees, and union requirements. A minimal documentary crew runs $1,000-5,000/day. Full narrative production: $50,000-500,000+/day.

How do indie budgets differ from studio?

Indies defer payments, use smaller crews, minimize locations, and favor non-union crew. Studio productions have more overhead, insurance requirements, and union obligations.

Por Qué Usar Esta Calculadora

  • Structure professional film budgets
  • Balance above and below the line
  • Plan post-production costs
  • Calculate cost per shooting day
  • Build in appropriate contingency

¿Necesitas Ayuda de Expertos?

Nuestro equipo puede ayudarte a construir una estrategia personalizada de entertainment.

Cotización Gratis

Insertar Esta Calculadora

Agrega esta calculadora a tu sitio web gratis.

"La calculadora de regalías me ayudó a entender lo que realmente gano del streaming. Revelador para negociar mi próximo contrato."

Artista Independiente, Producción Musical

Chat with AMW Online
Click to start talking