Video Production Budget Calculator

Estimate video production costs including crew, equipment, and post-production. Build accurate budgets for commercials, corporate videos, and content.

Calculator

Industry-standard rates and equipment

Pre-Production

Crew (per day)

Equipment Rentals (per day)

Post-Production

Budget Breakdown

Pre-Production$800
Crew (2 days)$7,600
Equipment (2 days)$2,900
Post-Production$3,600
Subtotal$14,900
Contingency (10%)$1,490
Cost Per Minute:$5,463
Production Level:standard
Total Budget:$16,390

* Estimates based on industry averages. Actual costs vary by location, talent availability, and specific project requirements.

Powered byAMW®

Cómo Usar Esta Calculadora

1

Set your number of shoot days and target video length.

2

Choose your production level to adjust rate expectations.

3

Select crew members, equipment, and post-production services needed.

4

Review your total budget with automatic contingency calculation.

Preguntas Frecuentes

What is a typical cost per finished minute of video?

Costs range dramatically: $1,000-3,000/minute for basic corporate video, $5,000-15,000/minute for polished commercial content, and $25,000+/minute for broadcast-quality production. The biggest factors are crew size, equipment quality, and post-production complexity.

How many shoot days should I budget for?

A general rule is 1 shoot day per 1-2 minutes of finished content for scripted work. Documentary style may require 3-5 days of shooting per finished minute. Always add buffer time—productions almost always run longer than planned.

What post-production costs are often underestimated?

Music licensing, color grading, and revision rounds are frequently underbudgeted. Licensed music can cost $500-5,000+ per track. Professional color grading adds $500-2,000. Budget for at least 2-3 revision rounds in your timeline and costs.

Should I rent or buy equipment?

For occasional productions, renting is almost always more cost-effective. Camera technology changes quickly, and rental houses maintain and insure equipment. Only consider purchasing if you shoot 100+ days per year or need specialized gear always on hand.

How much contingency should I include?

Standard practice is 10-15% contingency for productions with detailed planning, 20-25% for projects with unknowns (new locations, unproven concepts). This covers weather delays, equipment issues, additional takes, and scope changes during production.

Por Qué Usar Esta Calculadora

  • Build comprehensive budgets covering all production phases
  • Select specific crew roles and equipment needs
  • Compare basic, standard, and premium production levels
  • Calculate cost per finished minute of video
  • Include contingency for unexpected expenses

¿Necesitas Ayuda de Expertos?

Nuestro equipo puede ayudarte a construir una estrategia personalizada de entertainment.

Cotización Gratis

Insertar Esta Calculadora

Agrega esta calculadora a tu sitio web gratis.

"La herramienta de presupuesto de producción de video nos ayudó a definir un proyecto realista para el presupuesto de nuestro cliente. Sin más conversaciones incómodas."

Productor Ejecutivo, Productora

Chat with AMW Online
Connecting...

Before we start

So we know who we are talking to.